Built to be opened
Wire-numbered, ferruled, labeled, and torqued to spec. Every I/O point is tested on our floor before the panel ships, so first power-up on your site is a formality, not a troubleshooting session.
Engineering solutions. Built to perform.
UL 508A control panels, designed, built, installed, and integrated by one US-based team.
Why we do this
A control panel should be easy to understand, safe to work on, and built exactly as drawn. We design, build, install, and support every panel with one US-based team, so nothing gets lost between the drawing and startup.
Wire-numbered, ferruled, labeled, and torqued to spec. Every I/O point is tested on our floor before the panel ships, so first power-up on your site is a formality, not a troubleshooting session.
One I/O list drives the schematics, the build, and the PLC tags. As-builts are updated after commissioning, so the drawings in the door pocket show what's actually inside.
Design, panel build, and field support all come from a US-based team working US hours, with engineering offices in Clearwater, Florida. When you reach out, you get the people who drew and wired your panel.

The only thing that should be exciting on startup day is how smoothly it goes.

Wiring so clean and clearly labeled, your maintenance team will actually want to open the panel.

Every panel and program is tested before it leaves, so problems get fixed where it’s cheap.

New systems that talk to the PLCs, networks, and equipment you already rely on.
How we deliver
Schematics, panel layout, BOM, and an SCCR calculation drawn to UL 508A, then reviewed with you before anything is ordered.
Built on our own shop floor: wire-numbered, ferruled, and labeled to the drawings, with a calculated SCCR on the nameplate.
We set the panel, land field wiring, and commission it with your PLCs, drives, robots, and safety systems, on a new line or one that's already running.
Allen-Bradley, Siemens, or Ignition, matched to what your maintenance team already supports and stocks.
// Skid 2 · lead / lag pump control
// LeadIsP201 : BOOL := TRUE (P201 lead)
P201_Ok := P201.Avail AND NOT P201.Fault;
P202_Ok := P202.Avail AND NOT P202.Fault;
// Demand with hysteresis (Start > Stop)
IF LT201.PV >= SP.Start THEN
Demand := TRUE;
ELSIF LT201.PV <= SP.Stop THEN
Demand := FALSE;
END_IF;
IF NOT Demand THEN
P201.Run := FALSE;
P202.Run := FALSE;
ELSIF LeadIsP201 THEN
P201.Run := P201_Ok;
P202.Run := P202_Ok AND NOT P201_Ok; // lag
ELSE
P202.Run := P202_Ok;
P201.Run := P201_Ok AND NOT P202_Ok; // lag
END_IF;
Alm.P201_Flt := P201.Fault; // HMI + SCADA
Alm.P202_Flt := P202.Fault;
Alm.NoPumpAvail := Demand AND NOT P201_Ok
AND NOT P202_Ok;
IO-Link sensors and managed networks that tell you why a machine stopped, not just that it did.
Design, build, install, integrate: one accountable US-based team from the first drawing to SAT sign-off, and the same people you call afterward.

Inside the work · 01
Wire-numbered, ferruled, and labeled to the drawings, so an electrician can trace a fault at 3 a.m. without calling us.

Inside the work · 02
Robot controllers, drives, safety devices, and the line PLC tied together with clean handshakes, so a fault on either side says exactly why it stopped.

Inside the work · 03
Alarms that name the machine, the device, and the cause, plus trends that supervisors use to fix the worst problem first.

Inside the work · 04
Plants, DCs, and utilities that can't stop for long: obsolete PLCs and relay logic replaced in planned windows, with a spares list and documentation your maintenance team can actually use.
How we work
FAT checklist · Panel CP-201
01 · Before it ships
The I/O list, drawings, and BOM are checked against your mechanical layout before a hole is cut. Then the panel is powered up on our floor and tested point by point, with you on site or on a video call.
Active alarms · Line 2
PKG_L02_CELL1_Gate_OpenRobot cell 1 gate open · cell stoppedPKG_L02_FILL_M3_VFD_FltFiller drive M3 overcurrentPKG_L02_SKID_LT201_HiTank level high · inlet valve closed02 · One standard
PLC tags, HMI screens, and Ignition share one naming standard (area, line, zone, device, signal). An alarm on the floor HMI reads the same in SCADA and in the maintenance log, so nobody has to translate.
Planned cutover · example
03 · Around your schedule
Retrofits go in during weekends, holiday shutdowns, or planned outages with a written cutover plan: pre-wired panels, labeled field cables, a step-by-step checkout, and a way back to the old system if something goes wrong.
Sound familiar?
Late I/O changes, mixed Rockwell and Siemens sites, UL 508A paperwork, and a shutdown window that ends when production restarts. We plan the project around these conditions instead of discovering them at startup.
We get it. And we’ve got it covered.


Retrofits & upgrades
Keep the equipment that still works and replace the controls that don’t. We move older PLCs, HMIs, networks, and panels to current, supported hardware, with the same design, build, and integration care as a new panel.
Allen-Bradley PLC-5, SLC 500, and MicroLogix moved to ControlLogix or CompactLogix; Siemens S5 and S7-300/400 moved to S7-1500; Modicon and other end-of-life platforms moved to a current, supported controller. The logic is converted and cleaned up, not just copied, so the new program is easier to read and maintain.
Where it makes sense we reuse existing field wiring with conversion or swing-arm style kits and pre-wired harnesses, so less gets rewired and the line is down for less time.
Older operator panels such as PanelView Standard replaced with current HMIs, with refreshed graphics and alarm text that names the device and the cause, plus SCADA updates where you need plant-wide visibility.
Legacy networks like DH+, Remote I/O, DeviceNet, and Profibus moved to EtherNet/IP or PROFINET. That means standard Ethernet hardware, better diagnostics, and a network your team and IT can actually support.
Obsolete drives replaced, safety circuits brought up to current practice, and panels updated to current UL 508A and NFPA 79 expectations, with a calculated SCCR on the nameplate.
Staged or phased changeovers scheduled around your production, with testing before startup and drawings, I/O lists, and program backups updated to match what’s installed.
Why upgrade: parts availability, vendor support, cybersecurity, diagnostics, and lower downtime risk.
Data centers & critical power
UL 508A control, monitoring, and auxiliary distribution panels that run and watch over critical power equipment, integrated with the listed switchgear, ATS, UPS, and battery systems on site.
Transfer control and status panels built around a listed ATS or switchgear, plus generator start, load add, and load shed signals.
Fused or breaker distribution for controls and auxiliaries, control power transformers, redundant 24 VDC supplies, and surge protection, with SCCR calculated and marked on the nameplate.
Monitoring and gateway panels that feed your EPMS, BMS, or DCIM, plus PLC and VFD controls for cooling equipment.
Control and monitoring panels that interface with the battery management system (BMS) of a listed battery or energy storage system, bringing state, alarms, and trips into your PLC or SCADA.
How a project runs
This is the sequence we follow on every panel and integration project, whether it's a single machine panel or a full line. Each step ends with something you can review, so problems show up on paper or on our test bench instead of on your floor.
Typically 1–2 weeks
We walk the site or review the mechanical layout and P&IDs, then confirm voltage, available fault current, PLC platform, network, and any SCADA, MES, or WMS interfaces. The I/O list is built device by device.
You get: I/O list, scope and assumptions, schedule with long-lead items flagged.
Typically 2–4 weeks
Schematics and panel layout in EPLAN or AutoCAD Electrical, an SCCR calculation, a network and IP plan, and a BOM. You review and approve before anything is ordered.
You get: approval drawing set, BOM, SCCR calc, network drawing.
Typically 3–6 weeks
A UL 508A build that is wire-numbered, ferruled, and labeled to the drawings. PLC and HMI programming run in parallel against the approved I/O list.
You get: build photos and a program draft to review.
Typically 1–3 days
The panel is powered up in our shop. Every I/O point is rung out, the e-stop and safety functions are tested, VFD comms and parameters are loaded, and HMI screens are walked through with your team.
You get: signed FAT checklist, with the punch list closed before it ships.
Days to weeks, by scope
We set panels, land field wiring on labeled terminals, check each field device point to point, and connect to your existing PLCs, SCADA, robots, and safety systems. Cutover on running equipment is scheduled around your production.
You get: a written cutover plan with rollback steps.
Typically 2–5 days on site
We dry-run without product, then run at increasing rates while tuning sequences, loops, and handshakes until the system holds its target rate or cycle time. Then we train operators and maintenance.
You get: signed SAT, and operators who have run the system.
Ongoing
As-built drawings, final program backups, and a spare parts list. Remote or phone support follows your site's access rules.
You get: the closeout package listed below.
Durations are typical for a mid-size panel and integration package. Approvals, long-lead drives, and site access move them in either direction.
Specifics, not slogans
These are typical ranges across the panels and systems we build. They aren't guarantees: your site's fault current, process, and environment set the real values. Use them to sanity-check a spec or compare bids.
Platforms we build with
The PLC, HMI, SCADA, sensing, and panel hardware we program and build with every week. We recommend the platform that matches your installed base and spares shelf, because a system your techs already know how to troubleshoot comes back up faster.
Hands-on “we build with” experience, including Keyence vision. No borrowed partner or certification logos. See platform details · Software how-to guides · AI & PLC
Open-ended discovery
Each card is a scope we regularly quote: what the work involves, why plants and facilities buy it, and the kind of job we’ve done on it. Pick the one closest to your problem and we’ll talk through scope, timeline, and whether we’re the right fit.
A listed panel with a calculated short-circuit current rating (SCCR) on the nameplate and labeling that matches the drawings. Inspectors and insurers look for that label; having it avoids field evaluations, red tags, and delayed energization.
Typical scope: UL 508A listed panels with calculated SCCR — main panels and remote I/O for machines and lines.
Talk through this project
We tie the robot controller to the line PLC: part-present and place-complete handshakes, zone interlocks, and safety-rated fencing or scanners. Done right, the robot never starves or floods the next station, and a fault on either side tells the other exactly why it stopped.
Typical scope: Robot-to-line PLC handshakes, zone interlocks, and cell safety on packaging and assembly equipment.
Talk through this project
An Ignition layer over your PLCs: line overview, an alarm journal with real fault causes, historian trends, and downtime and fault counts by machine. Supervisors fix the machine that is actually losing output, and maintenance gets a fault history instead of a shift-change story.
Typical scope: Ignition overviews, alarm journals, and historian tags for plant and warehouse floors.
Talk through this project
PLC logic and drives for zero-pressure accumulation, merges, diverts, and VFD speed matching. The payoff is steady carton flow at rate, fewer jams, fewer people posted just to clear them, and code your techs can read.
Typical scope: PLC and VFD controls for accumulation, transfers, and packaging infeeds — new builds and retrofits.
Talk through this project
E-stop circuits, Keyence and Banner safety light curtains, Keyence safety laser scanners, and safety relays or safety PLCs laid out to the Performance Level (ISO 13849) your risk assessment calls for. Zoned stops and proper muting keep people protected without a nuisance trip shutting down the whole line.
Typical scope: E-stop chains, light curtains, and safety relays or safety PLCs laid out to the required PL or SIL.
Talk through this project
Outbound sortation, divert, and dock-door sequencing tied to your WMS. This is where warehouse and distribution automation pays back: fewer mis-sorts, less manual re-handling, and trucks loaded on time at peak.
Typical scope: Outbound, sortation, and dock sequencing with WMS interfaces and supervisor HMIs.
Talk through this project
PLC handshakes between case conveyors, layer formers, and the palletizer or sorter, plus divert logic that keeps lanes balanced. The pallet cell isn't starved by upstream jams, and the sorter holds rate on peak days.
Typical scope: Palletizer and sorter handshakes, lane balancing, and cell safety integration.
Talk through this project
Keyence vision for label, barcode, and orientation checks, IO-Link sensors that report diagnostics instead of just on/off, and HMI stations where the work happens. Faults get caught before a mis-ship leaves the dock, and techs see which sensor failed instead of hunting for it.
Typical scope: Vision OK/NG into PLC reject logic, IO-Link sensing, and line-side operator HMIs.
Talk through this projectInteractive tool
Pick an enclosure rating, PLC, HMI, and VFDs, rough in your I/O counts, and see an illustrative layout and parts list. Your first quote then reflects your actual device mix instead of a guess.
Quick fit check
Four questions: project type, PLC platform, UL 508A need, and timeline. You get an honest read on whether we’re the right team for it, and your answers carry into the contact form so you don’t type them twice.
Where we work
Manufacturing, packaging, food and beverage, warehousing and distribution, water and wastewater, process, pharma, building systems, and data centers. Same panel and integration craft across all of them.
Machine and line panels, washdown builds, robot cells, and end-of-line packaging — new equipment or upgrades to what’s already on the floor.
Material handling, picking, packing & shipping controls, pump and treatment panels, HVAC and utility plant automation, and data center and backup power control panels.
Skid and unit-operation panels, batch and continuous control, and documentation suited to sites that need a clear paper trail.
See industries & typical uses Batch process control Built to scale Healthcare & pharma distribution Print & apply RFID & tracking
Data security · OT cybersecurity
A common starting point: the PLCs share a flat network with office PCs, an HMI has TeamViewer installed for vendor support, and the only copy of the current program lives on a laptop. We fix that as part of the controls scope. We segment the controls network from IT, lock down remote access, harden PLCs and HMIs, and keep versioned backups you can restore in the middle of the night. The design follows IEC 62443 zones and conduits and maps to the NIST Cybersecurity Framework, so it holds up when your IT team, insurer, or a customer audit asks how the line is protected.
A locked PLC or an encrypted SCADA server stops production, not just a screen. How long you're down depends on whether you have a clean, current backup and a network you can trust.
If HMIs and engineering PCs sit on the same network as email laptops, malware that lands on one can reach the others. Segmentation keeps an incident inside one zone.
Cyber insurance renewals and customer supplier audits now ask about OT segmentation, MFA on remote access, and offline backups. A drawing and an SOP on file answer those questions in one email.
We map the work to IEC 62443 zones, conduits, and security levels and to NIST CSF 2.0 functions, so your IT security team can review it in terms they already use.
We divide the site into zones (each line or PLC cell, SCADA servers, engineering workstations, IT) and define the allowed paths between them. That means managed industrial switches (Stratix, Scalance, or equivalent) with VLANs, plus an industrial firewall at the IT/OT boundary (Stratix 5950, Scalance S, a rugged Fortinet-class unit, or your IT standard) with a default-deny rule set.
Why: a compromised office PC can't reach a PLC, and a broadcast storm on one line doesn't take down the next.
No port-forwarding to HMIs and no TeamViewer or AnyDesk on operator panels. Vendor and integrator access goes through a VPN gateway or remote-access appliance with MFA. Sessions land on a jump host in the DMZ, are switched on by your site for a set time window, and are logged.
Why: exposed remote-desktop tools are a common way into OT networks. You still get fast remote support; you just decide when it's on and can see what was done.
Logix key switches left in RUN where the process allows, which blocks remote mode changes and downloads. Rockwell CIP Security and FactoryTalk Security, or Siemens S7-1200/1500 access levels and know-how protection, where the hardware supports them. Default passwords removed, unused services, web servers, and switch ports disabled, and HMI runtimes locked down so operators can't drop to the desktop.
Why: accidental or unauthorized downloads and edits get much harder, without slowing down techs who have the right role.
We list every PLC, HMI, drive, switch, and server with model, firmware, IP address, and location. PLC, HMI, and drive programs go under version control with change notes (FactoryTalk AssetCentre, octoplant, or a well-run Git repository), with a copy kept offsite.
Why: when a controller fails or logic changes overnight, you can see what changed and who changed it, then roll back to a known-good version instead of hunting for a laptop.
We check vendor security advisories (Rockwell, Siemens ProductCERT, CISA ICS advisories) against your inventory and rank them by exposure. Firmware and OS updates are scheduled into planned maintenance windows, tested on a bench or spare controller first, with a rollback image ready.
Why: patching OT on the IT schedule breaks lines, and never patching leaves known holes open. A ranked plan closes the important ones without unplanned downtime.
Ignition gateways on TLS with a proper certificate and the gateway config pages kept off the plant-floor network. Role-based users and security zones, the audit log turned on, sign-in through Active Directory or SSO (LDAP, SAML, or OIDC), and scheduled gateway backups. We apply the same principles to FactoryTalk View SE and WinCC.
Why: operators get the screens they need, only engineers can change tags or projects, and every write is traceable to a named user.
Plant data leaves the controls zone through a DMZ, using a read-only historian replica or data broker that business systems read from, so WMS or ERP never talks straight to the PLCs. We use MQTT (Sparkplug B) or OPC UA with certificate-based authentication and encryption. Writes from the WMS, such as divert assignments, go through one defined and validated interface.
Why: sort decisions and ship counts depend on that data. One defined path is easier to secure, monitor, and troubleshoot than a dozen ad-hoc connections.
We write a recovery runbook covering which backup restores which device, in what order, and on what firmware. Then we prove it during FAT/SAT or a scheduled outage by loading a controller from backup and bringing a SCADA server up from its image.
Why: a backup nobody has restored is a guess. A tested runbook shortens an outage and takes the guesswork out of a bad night.
Check what's in place to see where you stand.
We're a controls integrator, not a managed security provider. We design and build these protections into your automation system and work with your IT and security team on the boundary. Alignment with IEC 62443 and NIST CSF describes how we design; it is not a certification.
Learn & decide
Reference pages we wrote for the people who scope, buy, and maintain these systems. Use them to tighten an RFQ, check a panel spec against a bid, or get a tech unstuck in Studio 5000 or Ignition.
Time to upgrade
If your controls are hanging on with hard-to-find parts, quick fixes, and a program only one person understands, it may be time. Send us what you’re running today and we’ll quote an upgrade that’s built to last.
The right way
Proper brackets, secured cables, clean labeling, and drawings that match what’s installed. It’s the small details that make equipment easier to run, troubleshoot, and maintain, and we build every project that way.
Next step
Email [email protected] for a quick fit check, or send drawings, an I/O list, or photos of the existing panel through the form. An engineer reads it and replies, usually within one business day, with questions or a budgetary next step.
Mon–Fri, 9:00 AM – 4:00 PM ET · we reply within one business day
Engineering offices in Clearwater, Florida · available for Zoom meetings
Thanks, a controls engineer will follow up within one business day. Anything to add? Email [email protected].