Engineering solutions. Built to perform.

Control panels done right. From drawing to startup.

UL 508A control panels, designed, built, installed, and integrated by one US-based team.

Talk to a controls engineer about your panel or automation project [email protected]

Why we do this

Automation is only as good as the panel behind it.

A control panel should be easy to understand, safe to work on, and built exactly as drawn. We design, build, install, and support every panel with one US-based team, so nothing gets lost between the drawing and startup.

Quality

Built to be opened

Wire-numbered, ferruled, labeled, and torqued to spec. Every I/O point is tested on our floor before the panel ships, so first power-up on your site is a formality, not a troubleshooting session.

Accuracy

Drawings that match the panel

One I/O list drives the schematics, the build, and the PLC tags. As-builts are updated after commissioning, so the drawings in the door pocket show what's actually inside.

US-based

Engineers you can reach

Design, panel build, and field support all come from a US-based team working US hours, with engineering offices in Clearwater, Florida. When you reach out, you get the people who drew and wired your panel.

Roller conveyor leading to packaging equipment in a large facility

No surprises at startup.

The only thing that should be exciting on startup day is how smoothly it goes.

Photo eye with a quick-disconnect cord on a roller conveyor frame

Open the door. Smile.

Wiring so clean and clearly labeled, your maintenance team will actually want to open the panel.

Long roller conveyor on blue stands with control panels in the background

Find it in the shop, not on the floor.

Every panel and program is tested before it leaves, so problems get fixed where it’s cheap.

Zoned powered roller conveyor merge in a warehouse aisle

New controls. Old friends.

New systems that talk to the PLCs, networks, and equipment you already rely on.

How we deliver

01

Design

Schematics, panel layout, BOM, and an SCCR calculation drawn to UL 508A, then reviewed with you before anything is ordered.

I/O list Schematic Panel PLC tag TT-104AI · 4–20 mA TT-104sheet 12.3 TT-104X2:14 · W1042 TT104_PVSlot 3 · Ch 2 One point, one name, from I/O list to HMI BOM · SCCR calc · network plan reviewed before ordering
Every point is traceable from the drawing to the terminal to the tag.
02

Build

Built on our own shop floor: wire-numbered, ferruled, and labeled to the drawings, with a calculated SCCR on the nameplate.

24V X1 field terminals480 VAC in · 24 VDC ctrl SCCR 65 kA @ 480 VAC
Illustrative backplate. SCCR depends on your available fault current.
03

Install · Integrate

We set the panel, land field wiring, and commission it with your PLCs, drives, robots, and safety systems, on a new line or one that's already running.

PLC Logix / S7-1500 Firewall IT / OT boundary Managed switch VLAN 20 · controls RIO Z1 RIO Z2 RIO Z3 HMI VFDs DLR / MRP ring
Ring topology: one cable cut doesn't stop the system.
04

PLC · SCADA · HMI

Allen-Bradley, Siemens, or Ignition, matched to what your maintenance team already supports and stocks.

One tag name from PLC to HMI to SCADA alarm journal.
05

Industrial IoT

IO-Link sensors and managed networks that tell you why a machine stopped, not just that it did.

100% 50% warn · 30% margin PE-07 signal margin · IO-Link Dirty lens flagged before it caused a stop
Diagnostics that point maintenance at the right sensor.
06

Support

Design, build, install, integrate: one accountable US-based team from the first drawing to SAT sign-off, and the same people you call afterward.

you approve our shop your site I/O listDesignBuildFATInstallSATSupport FAT before it ships · SAT before you sign
How a project runs →
UL 508A control panel interior with labeled wiring

Inside the work · 01

Panel builds

Wire-numbered, ferruled, and labeled to the drawings, so an electrician can trace a fault at 3 a.m. without calling us.

Industrial robot arm working in an automated cell

Inside the work · 02

Machines & robot cells

Robot controllers, drives, safety devices, and the line PLC tied together with clean handshakes, so a fault on either side says exactly why it stopped.

SCADA and HMI screens in a control room

Inside the work · 03

SCADA & HMI

Alarms that name the machine, the device, and the cause, plus trends that supervisors use to fix the worst problem first.

Operating distribution center floor

Inside the work · 04

Running facilities & retrofits

Plants, DCs, and utilities that can't stop for long: obsolete PLCs and relay logic replaced in planned windows, with a spares list and documentation your maintenance team can actually use.

How we work

Control panel interior during factory acceptance testing, with wire-numbered conductors in duct and labeled terminal strips

FAT checklist · Panel CP-201

  • Every I/O point rung out against the I/O list
  • E-stop chain and safety relay tested
  • VFD comms up, parameters loaded
  • Nameplate SCCR matches the calc

01 · Before it ships

Fewer field changes.

The I/O list, drawings, and BOM are checked against your mechanical layout before a hole is cut. Then the panel is powered up on our floor and tested point by point, with you on site or on a video call.

  • Design review against your mechanical layout, P&IDs, and device schedule
  • FAT with simulated I/O, so most code bugs are found before install, not during it
  • Punch list closed and signed before the panel leaves the shop
Stainless operator HMI on a pedestal showing live line status

Active alarms · Line 2

  1. PKG_L02_CELL1_Gate_OpenRobot cell 1 gate open · cell stopped
  2. PKG_L02_FILL_M3_VFD_FltFiller drive M3 overcurrent
  3. PKG_L02_SKID_LT201_HiTank level high · inlet valve closed

02 · One standard

One tag set. One alarm philosophy.

PLC tags, HMI screens, and Ignition share one naming standard (area, line, zone, device, signal). An alarm on the floor HMI reads the same in SCADA and in the maintenance log, so nobody has to translate.

  • Alarms name the machine, the device, and the likely cause
  • Priorities defined up front: stop the line, slow the line, or just tell someone
  • Tag database exported with the I/O list for your records
New control panel installed beside racking in an operating facility

Planned cutover · example

  1. Fri 22:00Last shift ends, line locked out
  2. Sat 06:00Old panel out, pre-wired panel set
  3. Sat 18:00Field I/O checked point to point
  4. Sun 10:00Dry run, then product at rate
  5. Mon 05:00First production shift · rollback plan on standby

03 · Around your schedule

Cutovers planned around your production.

Retrofits go in during weekends, holiday shutdowns, or planned outages with a written cutover plan: pre-wired panels, labeled field cables, a step-by-step checkout, and a way back to the old system if something goes wrong.

  • Field cables tagged and photographed before demolition
  • Temporary jumpers and a phased switchover where one weekend isn't enough
  • On-site support planned through the first production shift

Sound familiar?

The problems we show up for

Late I/O changes, mixed Rockwell and Siemens sites, UL 508A paperwork, and a shutdown window that ends when production restarts. We plan the project around these conditions instead of discovering them at startup.

Trying to hit go-live while the I/O map is still moving
Another budget cut, same UL508A and SCCR expectations
Juggling panel shops and programmers who blame each other
Zero visibility into what the equipment is actually doing
Pressure to justify controls spend with a clean design package
Panels that don’t match the drawings in the door pocket

We get it. And we’ve got it covered.

Labeled industrial control panel interior with wire duct and terminal strips
UL 508A panels · wire-numbered, ferruled, SCCR on the nameplate
Machine safety devices: light curtain and emergency stop
Machine safety · e-stops, light curtains, safety PLCs
Line-side control station with an HMI on a production floor
Line-side control stations & HMIs
Plant SCADA screens with trends and line status
Ignition overviews: equipment status, alarms, trends
Packaging line with bottles and a stainless operator station
Packaging lines · filler to case packer

Retrofits & upgrades

Retrofits & PLC upgrades

Keep the equipment that still works and replace the controls that don’t. We move older PLCs, HMIs, networks, and panels to current, supported hardware, with the same design, build, and integration care as a new panel.

Legacy PLC migrations

Allen-Bradley PLC-5, SLC 500, and MicroLogix moved to ControlLogix or CompactLogix; Siemens S5 and S7-300/400 moved to S7-1500; Modicon and other end-of-life platforms moved to a current, supported controller. The logic is converted and cleaned up, not just copied, so the new program is easier to read and maintain.

I/O and field wiring

Where it makes sense we reuse existing field wiring with conversion or swing-arm style kits and pre-wired harnesses, so less gets rewired and the line is down for less time.

HMI & SCADA upgrades

Older operator panels such as PanelView Standard replaced with current HMIs, with refreshed graphics and alarm text that names the device and the cause, plus SCADA updates where you need plant-wide visibility.

Network modernization

Legacy networks like DH+, Remote I/O, DeviceNet, and Profibus moved to EtherNet/IP or PROFINET. That means standard Ethernet hardware, better diagnostics, and a network your team and IT can actually support.

Drives, safety & panel updates

Obsolete drives replaced, safety circuits brought up to current practice, and panels updated to current UL 508A and NFPA 79 expectations, with a calculated SCCR on the nameplate.

Planned cutover

Staged or phased changeovers scheduled around your production, with testing before startup and drawings, I/O lists, and program backups updated to match what’s installed.

Why upgrade: parts availability, vendor support, cybersecurity, diagnostics, and lower downtime risk.

Data centers & critical power

Data center & battery backup control panels

UL 508A control, monitoring, and auxiliary distribution panels that run and watch over critical power equipment, integrated with the listed switchgear, ATS, UPS, and battery systems on site.

Transfer & generator controls

Transfer control and status panels built around a listed ATS or switchgear, plus generator start, load add, and load shed signals.

Control power & distribution

Fused or breaker distribution for controls and auxiliaries, control power transformers, redundant 24 VDC supplies, and surge protection, with SCCR calculated and marked on the nameplate.

EPMS, BMS & cooling

Monitoring and gateway panels that feed your EPMS, BMS, or DCIM, plus PLC and VFD controls for cooling equipment.

Battery & UPS integration

Control and monitoring panels that interface with the battery management system (BMS) of a listed battery or energy storage system, bringing state, alarms, and trips into your PLC or SCADA.

How a project runs

From I/O list to SAT sign-off, in seven steps

This is the sequence we follow on every panel and integration project, whether it's a single machine panel or a full line. Each step ends with something you can review, so problems show up on paper or on our test bench instead of on your floor.

  1. 01

    Kickoff & I/O list

    Typically 1–2 weeks

    We walk the site or review the mechanical layout and P&IDs, then confirm voltage, available fault current, PLC platform, network, and any SCADA, MES, or WMS interfaces. The I/O list is built device by device.

    You get: I/O list, scope and assumptions, schedule with long-lead items flagged.

  2. 02

    Design & drawings

    Typically 2–4 weeks

    Schematics and panel layout in EPLAN or AutoCAD Electrical, an SCCR calculation, a network and IP plan, and a BOM. You review and approve before anything is ordered.

    You get: approval drawing set, BOM, SCCR calc, network drawing.

  3. 03

    Panel build & programming

    Typically 3–6 weeks

    A UL 508A build that is wire-numbered, ferruled, and labeled to the drawings. PLC and HMI programming run in parallel against the approved I/O list.

    You get: build photos and a program draft to review.

  4. 04

    FAT

    Typically 1–3 days

    The panel is powered up in our shop. Every I/O point is rung out, the e-stop and safety functions are tested, VFD comms and parameters are loaded, and HMI screens are walked through with your team.

    You get: signed FAT checklist, with the punch list closed before it ships.

  5. 05

    Install & integrate

    Days to weeks, by scope

    We set panels, land field wiring on labeled terminals, check each field device point to point, and connect to your existing PLCs, SCADA, robots, and safety systems. Cutover on running equipment is scheduled around your production.

    You get: a written cutover plan with rollback steps.

  6. 06

    SAT & commissioning

    Typically 2–5 days on site

    We dry-run without product, then run at increasing rates while tuning sequences, loops, and handshakes until the system holds its target rate or cycle time. Then we train operators and maintenance.

    You get: signed SAT, and operators who have run the system.

  7. 07

    Closeout & support

    Ongoing

    As-built drawings, final program backups, and a spare parts list. Remote or phone support follows your site's access rules.

    You get: the closeout package listed below.

Durations are typical for a mid-size panel and integration package. Approvals, long-lead drives, and site access move them in either direction.

Specifics, not slogans

Numbers we design to, and what you get at closeout

These are typical ranges across the panels and systems we build. They aren't guarantees: your site's fault current, process, and environment set the real values. Use them to sanity-check a spec or compare bids.

Typical design values

What goes on the drawings

Incoming power
480Y/277 VAC 3-phase is most common in U.S. plants and DCs. 208/240 V and 600 V (Canada) on request.
Control power
24 VDC, sized with roughly 20–30% headroom, with a separately fused supply for field devices so a shorted sensor doesn't drop the PLC.
SCCR
Calculated per UL 508A Supplement SB and marked on the nameplate. Panels fed from DC switchgear often need 35–65 kA at 480 V.
I/O per drop
16–64 points per remote I/O drop is common, with about 20% spare left for changes.
Timing
PLC scan, I/O update, and network timing are sized to the fastest event on the machine, such as a high-speed reject, a servo move, or a sorter divert.
Network
EtherNet/IP or PROFINET on managed switches, with a DLR or MRP ring where a single cable fault can't be allowed to stop production.
Enclosure
NEMA 12 for indoor industrial areas, 4X stainless for washdown or outdoor sites. Cooling is sized from a heat-load calculation, not a guess.

Closeout package

What you receive

  • Electrical drawings in EPLAN or AutoCAD Electrical: schematics, panel layout, terminal plans. Native files plus PDF.
  • I/O list with tag name, address, device, and terminal for every point
  • Network drawing & IP plan covering switches, VLANs, and device addresses
  • BOM with manufacturer part numbers and a recommended spares list
  • SCCR calculation and nameplate data
  • Signed FAT and SAT checklists
  • Program backups for the PLC, HMI, drives, and SCADA, commented and version-labeled
  • As-built drawings updated after commissioning, not just the approval set
  • Alarm list & fault recovery notes for operators and maintenance

Platforms we build with

Industrial vendors & software we build with

The PLC, HMI, SCADA, sensing, and panel hardware we program and build with every week. We recommend the platform that matches your installed base and spares shelf, because a system your techs already know how to troubleshoot comes back up faster.

Allen-Bradley / RockwellCompactLogix · PowerFlex · Stratix SiemensS7-1500 · ET 200SP · SINAMICS Maple SystemsLine-side HMIs Schneider ElectricModicon · Altivar Ignition SCADAPerspective · Tag Historian BalluffIO-Link masters BannerPhotoeyes · light curtains Phoenix ContactTerminals · 24 VDC supplies KeyenceVision · barcode readers ABBDrives

Hands-on “we build with” experience, including Keyence vision. No borrowed partner or certification logos. See platform details · Software how-to guides · AI & PLC

Open-ended discovery

What do you need automated?

Each card is a scope we regularly quote: what the work involves, why plants and facilities buy it, and the kind of job we’ve done on it. Pick the one closest to your problem and we’ll talk through scope, timeline, and whether we’re the right fit.

UL508A listed industrial control panel with labeled components

Do you need a UL508A listed control panel?

A listed panel with a calculated short-circuit current rating (SCCR) on the nameplate and labeling that matches the drawings. Inspectors and insurers look for that label; having it avoids field evaluations, red tags, and delayed energization.

Typical scope: UL 508A listed panels with calculated SCCR — main panels and remote I/O for machines and lines.

Talk through this project
Industrial robot arm handling packages in an automated cell

Do you need robotic arm integration?

We tie the robot controller to the line PLC: part-present and place-complete handshakes, zone interlocks, and safety-rated fencing or scanners. Done right, the robot never starves or floods the next station, and a fault on either side tells the other exactly why it stopped.

Typical scope: Robot-to-line PLC handshakes, zone interlocks, and cell safety on packaging and assembly equipment.

Talk through this project
Ignition SCADA plant visibility dashboard on industrial monitors

Do you need SCADA integration (Ignition / plant visibility)?

An Ignition layer over your PLCs: line overview, an alarm journal with real fault causes, historian trends, and downtime and fault counts by machine. Supervisors fix the machine that is actually losing output, and maintenance gets a fault history instead of a shift-change story.

Typical scope: Ignition overviews, alarm journals, and historian tags for plant and warehouse floors.

Talk through this project
Automated conveyor line with photoeyes and motor drives

Do you need conveyor automation?

PLC logic and drives for zero-pressure accumulation, merges, diverts, and VFD speed matching. The payoff is steady carton flow at rate, fewer jams, fewer people posted just to clear them, and code your techs can read.

Typical scope: PLC and VFD controls for accumulation, transfers, and packaging infeeds — new builds and retrofits.

Talk through this project
Light curtains and emergency stop for industrial safety system upgrades

Do you need safety system upgrades (e-stop, light curtains, SIL/PL)?

E-stop circuits, Keyence and Banner safety light curtains, Keyence safety laser scanners, and safety relays or safety PLCs laid out to the Performance Level (ISO 13849) your risk assessment calls for. Zoned stops and proper muting keep people protected without a nuisance trip shutting down the whole line.

Typical scope: E-stop chains, light curtains, and safety relays or safety PLCs laid out to the required PL or SIL.

Talk through this project
Warehouse shipping and distribution center

Do you need warehouse / shipping & distribution line automation?

Outbound sortation, divert, and dock-door sequencing tied to your WMS. This is where warehouse and distribution automation pays back: fewer mis-sorts, less manual re-handling, and trucks loaded on time at peak.

Typical scope: Outbound, sortation, and dock sequencing with WMS interfaces and supervisor HMIs.

Talk through this project
Palletizing cell with gantry robot and stacked cases

Do you need palletizing or sortation cells?

PLC handshakes between case conveyors, layer formers, and the palletizer or sorter, plus divert logic that keeps lanes balanced. The pallet cell isn't starved by upstream jams, and the sorter holds rate on peak days.

Typical scope: Palletizer and sorter handshakes, lane balancing, and cell safety integration.

Talk through this project
Vision sensor and HMI operator station on a packaging line

Do you need vision, IO-Link, or HMI operator stations?

Keyence vision for label, barcode, and orientation checks, IO-Link sensors that report diagnostics instead of just on/off, and HMI stations where the work happens. Faults get caught before a mis-ship leaves the dock, and techs see which sensor failed instead of hunting for it.

Typical scope: Vision OK/NG into PLC reject logic, IO-Link sensing, and line-side operator HMIs.

Talk through this project

Interactive tool

Design your UL508A control panel

Pick an enclosure rating, PLC, HMI, and VFDs, rough in your I/O counts, and see an illustrative layout and parts list. Your first quote then reflects your actual device mix instead of a guess.

Build your quote

Quick fit check

Is this a fit for your project?

Four questions: project type, PLC platform, UL 508A need, and timeline. You get an honest read on whether we’re the right team for it, and your answers carry into the contact form so you don’t type them twice.

What kind of project is it?

Where we work

Industries we take projects in

Manufacturing, packaging, food and beverage, warehousing and distribution, water and wastewater, process, pharma, building systems, and data centers. Same panel and integration craft across all of them.

Plants & OEMs

Manufacturing, packaging & food

Machine and line panels, washdown builds, robot cells, and end-of-line packaging — new equipment or upgrades to what’s already on the floor.

Process & regulated

Process, chemical & pharma

Skid and unit-operation panels, batch and continuous control, and documentation suited to sites that need a clear paper trail.

See industries & typical uses Batch process control Built to scale Healthcare & pharma distribution Print & apply RFID & tracking

Data security · OT cybersecurity

Data security for your PLC, HMI, and SCADA network

A common starting point: the PLCs share a flat network with office PCs, an HMI has TeamViewer installed for vendor support, and the only copy of the current program lives on a laptop. We fix that as part of the controls scope. We segment the controls network from IT, lock down remote access, harden PLCs and HMIs, and keep versioned backups you can restore in the middle of the night. The design follows IEC 62443 zones and conduits and maps to the NIST Cybersecurity Framework, so it holds up when your IT team, insurer, or a customer audit asks how the line is protected.

Why it matters on a plant floor or DC

Downtime

The cost is a stopped line

A locked PLC or an encrypted SCADA server stops production, not just a screen. How long you're down depends on whether you have a clean, current backup and a network you can trust.

Ransomware

Flat networks let it spread

If HMIs and engineering PCs sit on the same network as email laptops, malware that lands on one can reach the others. Segmentation keeps an incident inside one zone.

Audits & insurance

Someone will ask

Cyber insurance renewals and customer supplier audits now ask about OT segmentation, MFA on remote access, and offline backups. A drawing and an SOP on file answer those questions in one email.

Frameworks

IEC 62443 & NIST CSF

We map the work to IEC 62443 zones, conduits, and security levels and to NIST CSF 2.0 functions, so your IT security team can review it in terms they already use.

What we do on a controls project

  • Zones & conduits: controls separated from IT

    We divide the site into zones (each line or PLC cell, SCADA servers, engineering workstations, IT) and define the allowed paths between them. That means managed industrial switches (Stratix, Scalance, or equivalent) with VLANs, plus an industrial firewall at the IT/OT boundary (Stratix 5950, Scalance S, a rugged Fortinet-class unit, or your IT standard) with a default-deny rule set.

    Why: a compromised office PC can't reach a PLC, and a broadcast storm on one line doesn't take down the next.

  • Secure remote access

    No port-forwarding to HMIs and no TeamViewer or AnyDesk on operator panels. Vendor and integrator access goes through a VPN gateway or remote-access appliance with MFA. Sessions land on a jump host in the DMZ, are switched on by your site for a set time window, and are logged.

    Why: exposed remote-desktop tools are a common way into OT networks. You still get fast remote support; you just decide when it's on and can see what was done.

  • PLC & HMI hardening

    Logix key switches left in RUN where the process allows, which blocks remote mode changes and downloads. Rockwell CIP Security and FactoryTalk Security, or Siemens S7-1200/1500 access levels and know-how protection, where the hardware supports them. Default passwords removed, unused services, web servers, and switch ports disabled, and HMI runtimes locked down so operators can't drop to the desktop.

    Why: accidental or unauthorized downloads and edits get much harder, without slowing down techs who have the right role.

  • Asset inventory & versioned backups

    We list every PLC, HMI, drive, switch, and server with model, firmware, IP address, and location. PLC, HMI, and drive programs go under version control with change notes (FactoryTalk AssetCentre, octoplant, or a well-run Git repository), with a copy kept offsite.

    Why: when a controller fails or logic changes overnight, you can see what changed and who changed it, then roll back to a known-good version instead of hunting for a laptop.

  • Patching & firmware that respects uptime

    We check vendor security advisories (Rockwell, Siemens ProductCERT, CISA ICS advisories) against your inventory and rank them by exposure. Firmware and OS updates are scheduled into planned maintenance windows, tested on a bench or spare controller first, with a rollback image ready.

    Why: patching OT on the IT schedule breaks lines, and never patching leaves known holes open. A ranked plan closes the important ones without unplanned downtime.

  • SCADA / Ignition hardening

    Ignition gateways on TLS with a proper certificate and the gateway config pages kept off the plant-floor network. Role-based users and security zones, the audit log turned on, sign-in through Active Directory or SSO (LDAP, SAML, or OIDC), and scheduled gateway backups. We apply the same principles to FactoryTalk View SE and WinCC.

    Why: operators get the screens they need, only engineers can change tags or projects, and every write is traceable to a named user.

  • Data integrity for WMS / MES / SCADA flows

    Plant data leaves the controls zone through a DMZ, using a read-only historian replica or data broker that business systems read from, so WMS or ERP never talks straight to the PLCs. We use MQTT (Sparkplug B) or OPC UA with certificate-based authentication and encryption. Writes from the WMS, such as divert assignments, go through one defined and validated interface.

    Why: sort decisions and ship counts depend on that data. One defined path is easier to secure, monitor, and troubleshoot than a dozen ad-hoc connections.

  • Recovery you've actually tested

    We write a recovery runbook covering which backup restores which device, in what order, and on what firmware. Then we prove it during FAT/SAT or a scheduled outage by loading a controller from backup and bringing a SCADA server up from its image.

    Why: a backup nobody has restored is a guess. A tested runbook shortens an outage and takes the guesswork out of a bad night.

Deliverables

What you get, on paper

  • Network architecture drawing: zones, conduits, VLANs, IP plan, and where every firewall and remote-access point sits
  • Firewall rule set: every allowed flow with source, destination, port, and the reason it exists
  • Remote access SOP: who approves access, how sessions start, how they're logged, and how they close
  • Backup & recovery plan: what's backed up, where, how often, and the tested restore steps
  • User / role matrix: who can view, operate, edit, and download on each PLC, HMI, and SCADA system
  • Asset inventory: devices, firmware revisions, and open advisories, ready to hand to IT or an auditor

Quick self-check

Which of these are true at your site today?

Check what's in place to see where you stand.

We're a controls integrator, not a managed security provider. We design and build these protections into your automation system and work with your IT and security team on the boundary. Alignment with IEC 62443 and NIST CSF describes how we design; it is not a certification.

Powered roller conveyor line with guarding

Time to upgrade

Ready to upgrade from equipment that’s barely getting by?

If your controls are hanging on with hard-to-find parts, quick fixes, and a program only one person understands, it may be time. Send us what you’re running today and we’ll quote an upgrade that’s built to last.

  • Barely getting byAfter the upgrade
  • Obsolete PLCs and hard-to-find spare partsCurrent, supported hardware
  • Quick fixes holding things togetherProper mounting, wiring, and labeling
  • A program only one person understandsClean code, as-built drawings, and backups
  • Unplanned downtimeBetter diagnostics and a planned cutover

The right way

Ready to do things the right way?

Proper brackets, secured cables, clean labeling, and drawings that match what’s installed. It’s the small details that make equipment easier to run, troubleshoot, and maintain, and we build every project that way.

  • Devices mounted on proper hardware, not improvised
  • Cables routed, secured, and labeled
  • Tested before handover and documented as built
Photoelectric sensor on a proper mounting bracket with its cable secured, on a roller conveyor

Next step

Ready to scope your control panel or automation project?

Email [email protected] for a quick fit check, or send drawings, an I/O list, or photos of the existing panel through the form. An engineer reads it and replies, usually within one business day, with questions or a budgetary next step.

[email protected]

Mon–Fri, 9:00 AM – 4:00 PM ET · we reply within one business day
Engineering offices in Clearwater, Florida · available for Zoom meetings

Your request goes straight to a controls engineer. Expect a reply within one business day.